The largest warehouse complex is 23,550 m²
About the project:
Ukraine
Problem
-
Object design
Many criteria were defined for this object, and one of the important tasks was the creation of a warehouse complex for a certain volume of products
-
Convenient access and logistics
Choosing the optimal warehouse location. 24/7 unhindered movement of large vehicles, convenience during loading and unloading.
-
Safety and protection from environmental factors
Folded joints ensure 100% waterproofness and tightness
-
Design and construction of a "turnkey" object in a short time
100% done! We completed all the tasks, construction works, and put the object into operation in a timely manner!
Stages of work
-
1. Geodetic and geological searches
-
2. Projecting and 3D visualization of the object
-
3. Coordination with suppliers and purchase of all building materials
-
4. Fixation of anchor fittings to the existing foundation
-
5. Formation of formwork
-
6. Works on the formation of the reinforcing frame
-
7. Concreting of walls
-
8. Installation of the dome frame on embedded parts
-
9. Concreting the dome
-
10. External waterproofing of concrete structures
-
11. Installation of supply and exhaust ventilation system
-
12. Installation of folding gates and doors
In the end parts and sides
-
13. Installation of the lighting system
-
14. Floor covering installation
outside and inside (paving and drainage system)
Experience and professionalism
The company "Business Agro Invest" is proud of all its facilities, but this one is one of the largest and most powerful. Our company won the hellish competition for the tender and was able to build this warehouse complex. A big role in the victory was played by our many years of experience, professional approach and availability of proven suppliers of building materials in large volumes!